Requirements
- The patches were applied successfully in a system (test or development system).
- You have performed a modification adjustment (Transaction SPAU).
Procedure
- Load the patches in the next system (quality or production system). You must differentiate between the following scenarios:
- Apply the patches as usual.
- Import the modification adjustment transport.
- Your systems have a common transport directory:
Release 3.x:
Run RSEPSDOL in the source system and RSEPSUPL in the target system.
Release 4.x:
In the target system, choose SPAM ® Patch ® Upload.
- Your systems do not have a common transport directory:
Release 3.x:
Run RSEPSDOL in the source system.
With the command ftp , transfer all the files with the extension *.PAT in binary mode and all the files with the extension *.ATT in ASCII mode from the source system directory /usr/sap/trans/EPS/in (UNIX) to the target system transport directory.
Run RSEPSUPL in the target system.
Release 4.x:
With the command ftp , transfer all the files with the extension *.PAT in binary mode from the source system directory /usr/sap/trans/EPS/in (UNIX) to the target system transport directory.
In the target system, choose SPAM ® Patch ® Upload.
No comments:
Post a Comment